[Contents] [Prev] [Next] [Index] [Report an Error]

Verifying a Unified ISSU

To verify the status of FPCs and their corresponding PICs after the most recent unified ISSU, issue the show chassis in-service-upgrade command on the master Routing Engine:


user@host> show chassis in-service-upgrade
  Item           Status                  Reason
  FPC 0          Online               
  FPC 1          Online               
  FPC 2          Online               
    PIC 0        Online               
    PIC 1        Online               
  FPC 3          Offline                 Offlined by CLI command                              
  FPC 4          Online               
    PIC 1        Online               
  FPC 5          Online               
    PIC 0        Online               
  FPC 6          Online               
    PIC 3        Online               
  FPC 7          Online               

For more information about the show chassis in-service-upgrade command, see the JUNOS System Basics and Services Command Reference.


[Contents] [Prev] [Next] [Index] [Report an Error]