Verify That Graceful Routing Engine Switchover and Nonstop
Active Routing Are Configured
Before you begin a unified ISSU, ensure that graceful Routing
Engine switchover and nonstop active routing are configured on your
router.
- To verify graceful Routing Engine switchover is configured,
on the backup Routing Engine (re1) issue the show system
switchover command. The output should be similar to the following
example. The Graceful switchover field state must be On.
{backup}
user@host> show system switchover
Graceful switchover: On
Configuration database: Ready
Kernel database: Ready
Peer state: Steady State
- To verify nonstop active routing is configured, on the
master Routing Engine (re0) issue the show task replication command. The output should be similar to the following example.
{master}
user@host> show task replication
Stateful Replication: Enabled
RE mode: Master
Protocol Synchronization Status
OSPF Complete
IS-IS Complete
If graceful Routing Engine switchover and nonstop active routing
are not configured, complete the following steps:
- On the master Routing Engine (re0), enable
graceful Routing Engine switchover. Include the graceful-switchover statement at the [edit chassis redundancy] hierarchy level.
- On the master Routing Engine, enable nonstop active
routing. Include the commit synchronize statement at the [edit system] hierarchy level and the nonstop-routing statement at the [edit routing-options] hierarchy level.
- On the master Router Engine, issue the commit command.
The system provides the following confirmation that the master
and backup Routing Engines are synchronized:
re0:
configuration check succeeds
re1:
commit complete
re0:
commit complete