[
Contents
] [
Prev
] [
Next
] [
Index
] [
Report an Error
]
Verification
To confirm that the configuration is working properly, perform these tasks:
Verifying the Active PGCP Configuration
Verifying That Gates Are Running
Verifying PGCP Terminations
Verifying PGCP Flows
Verifying H.248 Parameters Set by the PGC
[
Contents
] [
Prev
] [
Next
] [
Index
] [
Report an Error
]