[Contents] [Prev] [Next] [Index] [Report an Error]


Step 1: Check the SIB Connection

Action

To check the SIB connection, make sure that it is properly seated in the midplane. Ensure that none of the pins are bent. Check the thumbscrews on the ejector locking tabs.


[Contents] [Prev] [Next] [Index] [Report an Error]