For specifications on the electrical requirements for the system, see System Specifications. For details on the power consumed by the different ERX modules, see the ERX Module Guide.
![]() |
Note: In this procedure, we assume that the system is already connected to a power source. See Cabling ERX Routers. |
![]() |
Caution: Evaluate the overall loading of the branch circuit before you install any equipment into a rack. |
To power up the system:
When the prompt appears on the system console, the system is in User Exec mode and is ready to be configured:
In Privileged Exec mode you can begin to configure the system. See JUNOSe System Basics Configuration Guide, Chapter 2, Command-Line Interface for more information.
Each line module is initialized independently. As a result, the CLI on the SRP module can become available before the line modules have completed initialization. Commands relating to a line module might fail if the module has not completed initialization. You can use the show version command to display line module status. Do not enter commands for a line module until its state is listed as online.