[Contents] [Prev] [Next] [Index] [Report an Error] [No Frames]


Before You Configure Transparent Bridging

Before you configure transparent bridging on an E-series router, verify that:

Table 23 lists the prerequisite tasks for configuring transparent bridging and the resources that you can consult to learn how to perform these tasks.

Table 23: Prerequisite Tasks for Configuring Transparent Bridging 
To Learn About
See

Preconfiguration and hardware diagnostic procedures

ERX Hardware Guide

E120 and E320 Hardware Guide

Configuring T3 ATM line modules

JUNOSe Physical Layer Configuration Guide, Chapter 2, Configuring T3 and E3 Interfaces

Configuring OCx/STMx ATM line modules

JUNOSe Physical Layer Configuration Guide, Chapter 3, Configuring Unchannelized OCx/STMx Interfaces

Configuring Ethernet line modules

JUNOSe Physical Layer Configuration Guide, Chapter 5, Configuring Ethernet Interfaces


Also have the following information available:


[Contents] [Prev] [Next] [Index] [Report an Error] [No Frames]