[Contents] [Prev] [Next] [Index] [Report an Error]

OAM

A simple solution based on ANCP provides B-RAS with an access-line test capability. When enabled through the CLI, the B-RAS uses an ANCP message to trigger the access-node to perform a loopback test on the local loop (between the access node and the CPE). The access node reports the results of the test by means of another ANCP message.


[Contents] [Prev] [Next] [Index] [Report an Error]