[Contents] [Prev] [Next] [Index] [Report an Error]

Proper Rack Installation

To confirm proper equipment rack installation, verify the following:

Caution: To maintain airflow requirements for an E320 router, a plenum must be installed above the E320 router before any other piece of equipment is installed above it.

Figure 34: Airflow for the E320 Router

Image g015312.gif


[Contents] [Prev] [Next] [Index] [Report an Error]