After you have correctly cabled the SRP IOA, you must attach grounding and electrical wires before you attempt system power-up. See Figure 27.
Three main tasks are involved:
![]() |
Caution: Switches may have inadvertently flipped to ON during shipping and installation. |
![]() |
Warning: Always connect the grounding wires first (before connecting the power cables) and disconnect them last when installing or servicing the router. |
See System Specifications for the power requirements for the router. Table 9 identifies the cabling requirements.
Table 9: E320 Router PDU Cables and Wires Needed
Figure 27 shows the main components of a PDU.
Figure 27: PDU