[Contents]
[Prev]
[Next]
[Index]
[Report an Error]
Verifying the Installation
To verify that the installation is complete:
- After you have cabled the system for power,
as described in Cabling ERX Routers, turn on
the power switches.
The system reboots.
- Issue the show redundancy command, and verify that the display shows the redundancy hardware.
[Contents]
[Prev]
[Next]
[Index]
[Report an Error]