[Contents] [Prev] [Next] [Index] [Report an Error]

Proper Rack Installation

To confirm proper equipment rack installation, verify the following:

Caution: To maintain airflow requirements, a plenum must be installed above ERX-14xx models before any other piece of equipment is installed above the router.

Figure 53: Airflow for ERX Routers

Image g013785.gif


[Contents] [Prev] [Next] [Index] [Report an Error]