After you have correctly cabled the modules and I/O modules, you must attach grounding and electrical wires before you attempt system power-up. Three main tasks are involved:
![]() |
Caution: Switches may have inadvertently flipped to ON during shipping and installation. |
![]() |
Warning: Always connect the grounding wires first (before connecting the power cables) and disconnect them last when installing or servicing the router. |
See System Specifications for the power requirements for ERX routers. Table 9 identifies the power input module cabling requirements, and Figure 26 shows the main components of a power input module.
Table 9: Power Input Module Cables and Wires Needed
Figure 26: Power Input Module for ERX-14xx Models
