Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation  Back up to About Overview 
  
[+] Expand All
[-] Collapse All

Index

 A  C  D  E  F  H  I  J  M  P  R  S  T  U  V

 

A

AC power supply, replacing
accessing    
connecting directly
console ports
HyperTerminal
management console
SSH setup
 

C

cabling    
fast Ethernet
interface module
management ports
overview
power    12
recommendations
required tools
Case Manager, Juniper
cleaning platform
clock module
compact flash card, installing and removing
compliance, regulatory    
Canadian
FCC    12
FDA
console     See management console    
CTP overview    12
CTP2000    
hot-swap
CTP2000 4WE&M interface module    1
pinouts
port signaling jumper positions
supervisory signaling
CTP2000 compression interface module
CTP2000 FXS/FXO interface modules    1
analog ground-start signaling
analog loop-start signaling
digital signaling
pinouts
CTP2000 IRIG interface module
CTP2000 multiservice interface module
CTP2000 serial interface modules
CTP2000 T1/E1 interface module
CTP2008 platform    1
specifications
CTP2024 platform    1
specifications
CTP2056 platform    1
specifications
CTPOS
CTPView
customer support    1
contacting Juniper
information needed
locating serial numbers
return procedure    12
 

D

damaged components, returning
DB-9    
connector
crossover cable
DC power
declaration of conformity, EC    
CTP2000
 

E

EIA530(A) data interface
environmental requirements
 

F

fan trays    
installing
removing
 

H

hot-swap    
CTP2000
HyperTerminal access
 

I

inspecting before installation
installing    
AC power supply
before
compact flash card
fan trays
freestanding
modules    12
PMC module
rack
responsibilities
safety guidelines
SFPs
tools required
interface modules    
cabling
IRIG data interface module
 

J

JTAC, contacting    12
 

M

maintaining    
cleaning
fan trays, installing and removing    12
storing modules
tools required
management console    
accessing
direct connection
pinouts
port setup
management ports, cabling
modules and components    
cleaning
installing    12
protecting
removing
replacing
storing
upgrading
 

P

PCI mezzanine card (PMC) module    
installing
pinouts    
4WE&M interface
FXS/FXO interface
power    
cables, DC
cabling
failures
shutdowns
powering off
powering on    12
preinstallation responsibilities
 

R

rack    
installation guidelines    12
installing in
mechanical requirements
requirements
space requirements
reclamation and recycling
removing modules
replacing components
return procedure    12
RJ-45 connector    123456789
RS-232 port    1234
 

S

safety guidelines    1
installation
serial number, locating
SFPs (small form-factor pluggable transceivers)    
installing
removing
SSH connection
storing components
 

T

technical support
troubleshooting power failures    12
 

U

uninstalling modules
unpacking and inspecting
upgrading    
modules
 

V

V.35 data interface

Modified: 2015-11-22