A
C
- cabling
- fast Ethernet 1, 2
- overview
- power 1, 2
- recommendations
- required tools
- Case Manager, Juniper
- cleaning platform
- compliance, regulatory
- console See management console
- CTP overview
- CTP1002 platform 1
- CTP1004 platform 1
- CTP1012 platform 1
- CTPOS
- CTPView
- customer support 1
- contacting Juniper
- information needed
- locating serial numbers
- return procedure 1, 2
D
- damaged components, returning
- DB-25 connector 1, 2
- DB-9
- declaration of conformity, EC
E
H
I
- inspecting before installation
- installing
- interface modules
- pinouts See pinouts
J
M
- maintaining
- management console
- modules and components
P
- pinouts
- power
- powering off
- powering on 1, 2
- preinstallation responsibilities
R
S
T
- technical support
- troubleshooting power failures 1, 2
U
V
Download This Guide
Related Documentation
CTP1000 Environmental Requirements
See one of the following topics for complete environmental specifications:
- CTP1002 Platform Specifications and Certification
- CTP1004 Platform Specifications and Certification
- CTP1012 Platform Specifications and Certification
Choose a location for the device that is dry, relatively dust free, well ventilated, and air conditioned. If you install equipment in a rack, be sure that the floor is capable of supporting the combined weight of the rack and the installed equipment. Place the device in a location with sufficient access to power and network cables.
Like other network devices, the device generates a significant amount of heat. You must provide a balanced environment so that the device performs properly and safely. See the individual system specifications for acceptable ranges of temperature and humidity.
Be sure to allow enough space around the device for adequate ventilation. Inadequate ventilation can cause the device to overheat.
![]() | Caution: Do not block the air vents on the device. Otherwise, the device might overheat. |