Navigation
Back up to About Overview
[+] Expand All
[-] Collapse All
A
C
- cabling
- fast Ethernet 1, 2
- overview
- power 1, 2
- recommendations
- required tools
- Case Manager, Juniper
- cleaning platform
- compliance, regulatory
- console See management console
- CTP overview
- CTP1002 platform 1
- CTP1004 platform 1
- CTP1012 platform 1
- CTPOS
- CTPView
- customer support 1
- contacting Juniper
- information needed
- locating serial numbers
- return procedure 1, 2
D
- damaged components, returning
- DB-25 connector 1, 2
- DB-9
- declaration of conformity, EC
E
H
I
- inspecting before installation
- installing
- interface modules
- pinouts See pinouts
J
M
- maintaining
- management console
- modules and components
P
- pinouts
- power
- powering off
- powering on 1, 2
- preinstallation responsibilities
R
S
T
- technical support
- troubleshooting power failures 1, 2
U
V
Download This Guide
Related Documentation
CTP1000 Rack Requirements
When allocating equipment rack space, consider the following:
- Type of equipment racks recommended for the system
- Number of equipment racks required to hold your current system configuration
- Future expansion
Make sure that your distribution rack meets basic mechanical and space requirements and complies with conventional standards. In the United States, use EIA-310-D Cabinets, Racks, Panels, and Associated Equipment, September 1992.