Navigation
Back up to About Overview
[+] Expand All
[-] Collapse All
A
C
- cabling
- fast Ethernet 1, 2
- overview
- power 1, 2
- recommendations
- required tools
- Case Manager, Juniper
- cleaning platform
- compliance, regulatory
- console See management console
- CTP overview
- CTP1002 platform 1
- CTP1004 platform 1
- CTP1012 platform 1
- CTPOS
- CTPView
- customer support 1
- contacting Juniper
- information needed
- locating serial numbers
- return procedure 1, 2
D
- damaged components, returning
- DB-25 connector 1, 2
- DB-9
- declaration of conformity, EC
E
H
I
- inspecting before installation
- installing
- interface modules
- pinouts See pinouts
J
M
- maintaining
- management console
- modules and components
P
- pinouts
- power
- powering off
- powering on 1, 2
- preinstallation responsibilities
R
S
T
- technical support
- troubleshooting power failures 1, 2
U
V
Download This Guide
Related Documentation
Before You Power On the CTP1000 Platform
Before powering on the device, make sure you complete the following tasks. See the appropriate sections for information about these tasks.
![]() | Warning: Be sure the power source is turned off and the device is turned off before you perform the installation tasks. |
- Installing a CTP Interface Module, Processor Module, or Clock Module
- Cabling the CTP Platform for DC Power
- Setting Up Management Access on the CTP1000 Platform