Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation  Back up to About Overview 
ContentIndex
  
[+] Expand All
[-] Collapse All

 A  C  D  E  H  I  J  M  P  R  S  T  U  V

 

A

accessing    
connecting directly
console ports
HyperTerminal
management console
SSH setup
 

C

cabling    
fast Ethernet    12
overview
power    12
recommendations
required tools
Case Manager, Juniper
cleaning platform
compliance, regulatory    
Canadian
FCC    12
FDA
console     See management console    
CTP overview
CTP1002 platform    1
specifications
CTP1004 platform    1
specifications
CTP1012 platform    1
specifications
CTPOS
CTPView
customer support    1
contacting Juniper
information needed
locating serial numbers
return procedure    12
 

D

damaged components, returning
DB-25 connector    12
DB-9    
connector
crossover cable
declaration of conformity, EC    
CTP1000
 

E

EIA-530 data interface
EIA530(A) data interface
environmental requirements
 

H

HyperTerminal access
 

I

inspecting before installation
installing    
before
freestanding
responsibilities
interface modules    
pinouts     See pinouts    
 

J

JTAC, contacting    12
 

M

maintaining    
cleaning
storing modules
tools required
management console    
accessing
direct connection
pinouts
port setup
modules and components    
cleaning
replacing
storing
 

P

pinouts    
100-pin connector
power    
cables, DC    12
failures
shutdowns
powering off
powering on    12
preinstallation responsibilities
 

R

rack    
installation guidelines
installing in
mechanical requirements
requirements
space requirements
reclamation and recycling
replacing components
return procedure    12
RJ-45 connector    123456
RS-232 port    123456
 

S

safety guidelines
serial number, locating
SSH connection
storing components
 

T

technical support
troubleshooting power failures    12
 

U

unpacking and inspecting
 

V

V.35 data interface

Installing the CTP1000 Platform in a Rack

To install the CTP platform in a rack, you need:

  • Phillips screwdriver
  • Four 10-32 x 3/8 Phillips screws for each device to be installed

Follow these guidelines:

  1. Following your installation plan, use a tape measure and marking pen to measure and mark space on each equipment rack for each platform component. For horizontal spacing, follow Network Equipment Building System (NEBS) requirements.
  2. With one person standing on the left side of the device and another standing on the right side, lift the device into the rack.
  3. Position the device in its designated location in the equipment rack. Make sure the holes of the mounting brackets align evenly with the holes of the equipment rack on both sides.
  4. Starting at the bottom of the device, secure the device in the equipment rack by using the 10-32 x 3/8 Phillips screws. Have a third person do this for the larger and heavier CTP chassis.
  5. Connect the necessary cables. (SeeCabling the CTP1000 Platform Overview for instructions about installing the cables.)

Related Documentation

Modified: 2015-11-22