Navigation
Back up to About Overview
[+] Expand All
[-] Collapse All
A
C
- cabling
- fast Ethernet 1, 2
- overview
- power 1, 2
- recommendations
- required tools
- Case Manager, Juniper
- cleaning platform
- compliance, regulatory
- console See management console
- CTP overview
- CTP1002 platform 1
- CTP1004 platform 1
- CTP1012 platform 1
- CTPOS
- CTPView
- customer support 1
- contacting Juniper
- information needed
- locating serial numbers
- return procedure 1, 2
D
- damaged components, returning
- DB-25 connector 1, 2
- DB-9
- declaration of conformity, EC
E
H
I
- inspecting before installation
- installing
- interface modules
- pinouts See pinouts
J
M
- maintaining
- management console
- modules and components
P
- pinouts
- power
- powering off
- powering on 1, 2
- preinstallation responsibilities
R
S
T
- technical support
- troubleshooting power failures 1, 2
U
V
Download This Guide
Before You Install the CTP1000 Platform
Before installing the platform:
- Refer to the platform specifications for the particular CTP model or series.
- Have a plan for installing the device that takes into consideration future expansion.
- Have the tools and accessories needed to complete the installation.
- Read and understand the clearance requirements for the front and back of the chassis for cable routing and other unit access. SeeCTP1000 Environmental Requirements for more information.
- Read and understand the clearance requirements for the top and bottom of the chassis to ensure adequate ventilation.
- Prepare the equipment racks by measuring and marking space for each device and plenum you plan to install.