Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation  Back up to About Overview 
ContentIndex
  
[+] Expand All
[-] Collapse All

 A  C  D  E  H  I  J  M  P  R  S  T  U  V

 

A

accessing    
connecting directly
console ports
HyperTerminal
management console
SSH setup
 

C

cabling    
fast Ethernet    12
overview
power    12
recommendations
required tools
Case Manager, Juniper
cleaning platform
compliance, regulatory    
Canadian
FCC    12
FDA
console     See management console    
CTP overview
CTP1002 platform    1
specifications
CTP1004 platform    1
specifications
CTP1012 platform    1
specifications
CTPOS
CTPView
customer support    1
contacting Juniper
information needed
locating serial numbers
return procedure    12
 

D

damaged components, returning
DB-25 connector    12
DB-9    
connector
crossover cable
declaration of conformity, EC    
CTP1000
 

E

EIA-530 data interface
EIA530(A) data interface
environmental requirements
 

H

HyperTerminal access
 

I

inspecting before installation
installing    
before
freestanding
responsibilities
interface modules    
pinouts     See pinouts    
 

J

JTAC, contacting    12
 

M

maintaining    
cleaning
storing modules
tools required
management console    
accessing
direct connection
pinouts
port setup
modules and components    
cleaning
replacing
storing
 

P

pinouts    
100-pin connector
power    
cables, DC    12
failures
shutdowns
powering off
powering on    12
preinstallation responsibilities
 

R

rack    
installation guidelines
installing in
mechanical requirements
requirements
space requirements
reclamation and recycling
replacing components
return procedure    12
RJ-45 connector    123456
RS-232 port    123456
 

S

safety guidelines
serial number, locating
SSH connection
storing components
 

T

technical support
troubleshooting power failures    12
 

U

unpacking and inspecting
 

V

V.35 data interface

Before You Install the CTP1000 Platform

Before installing the platform:

  • Refer to the platform specifications for the particular CTP model or series.
  • Have a plan for installing the device that takes into consideration future expansion.
  • Have the tools and accessories needed to complete the installation.
  • Read and understand the clearance requirements for the front and back of the chassis for cable routing and other unit access. SeeCTP1000 Environmental Requirements for more information.
  • Read and understand the clearance requirements for the top and bottom of the chassis to ensure adequate ventilation.
  • Prepare the equipment racks by measuring and marking space for each device and plenum you plan to install.

Related Documentation

Modified: 2015-11-22