Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation  Back up to About Overview 
ContentIndex
  
[+] Expand All
[-] Collapse All

 A  C  D  E  H  I  J  M  P  R  S  T  U  V

 

A

accessing    
connecting directly
console ports
HyperTerminal
management console
SSH setup
 

C

cabling    
fast Ethernet    12
overview
power    12
recommendations
required tools
Case Manager, Juniper
cleaning platform
compliance, regulatory    
Canadian
FCC    12
FDA
console     See management console    
CTP overview
CTP1002 platform    1
specifications
CTP1004 platform    1
specifications
CTP1012 platform    1
specifications
CTPOS
CTPView
customer support    1
contacting Juniper
information needed
locating serial numbers
return procedure    12
 

D

damaged components, returning
DB-25 connector    12
DB-9    
connector
crossover cable
declaration of conformity, EC    
CTP1000
 

E

EIA-530 data interface
EIA530(A) data interface
environmental requirements
 

H

HyperTerminal access
 

I

inspecting before installation
installing    
before
freestanding
responsibilities
interface modules    
pinouts     See pinouts    
 

J

JTAC, contacting    12
 

M

maintaining    
cleaning
storing modules
tools required
management console    
accessing
direct connection
pinouts
port setup
modules and components    
cleaning
replacing
storing
 

P

pinouts    
100-pin connector
power    
cables, DC    12
failures
shutdowns
powering off
powering on    12
preinstallation responsibilities
 

R

rack    
installation guidelines
installing in
mechanical requirements
requirements
space requirements
reclamation and recycling
replacing components
return procedure    12
RJ-45 connector    123456
RS-232 port    123456
 

S

safety guidelines
serial number, locating
SSH connection
storing components
 

T

technical support
troubleshooting power failures    12
 

U

unpacking and inspecting
 

V

V.35 data interface

Table of Contents

Overview
CTP1000 Series Platform Overview
Introducing CTP Platforms
CTP1002 Platform
CTP1004 Platform
CTP1012 Platform
Planning
System Specifications
CTP1002 Platform Specifications and Certification
CTP1004 Platform Specifications and Certification
CTP1012 Platform Specifications and Certification
Planning and Preparing the Site
Before You Install a CTP Platform
CTP1000 Environmental Requirements
Equipment Rack Requirements
CTP1000 Rack Requirements
CTP1000 Mechanical Requirements
CTP1000 Space Requirements
CTP1000 Rack Installation
CTP Cabling Recommendations
Cable and Pinout Specifications
CTP1000 Interface Module 100-to-25-Pin Cable Pinouts
EIA-530 Connector Interface Signal Pinouts
RS-232 Connector Interface Signal Pinouts
Voice Interface Signal Pinouts
T1 Interface Signal Pinouts
CTP1000 Console Cable Pinouts
CTP Fast Ethernet and Power Cables
Fast Ethernet Cables
DC Power Cables
Safety
General Safety Guidelines
CTP Safety Guidelines and Warnings
Hardware Compliance
Declaration of Conformity for CTP1000 Platforms
Federal Communications Commission (FCC) Statement
FCC Requirements for Consumer Products
Food and Drug Administration, Center for Devices and Radiological Health
Compliance with Canadian Regulations
Industry Canada Notice
Industry Canada Notice CS-03
Avis CS-03 d'Industrie Canada
Canadian Department of Communications Explanatory Notes
DOC Explanatory Notes: Equipment Attachment Limitations
Notes explicatives du ministère des Communications: limites visant les accessoires
Installation
Unpacking and Inspecting the CTP Platform
Before You Unpack the CTP Platform
Unpacking the CTP Device
Inspecting Platform Components and Accessories
If You Detect or Suspect Damage
Contacting Juniper Networks
Installing the Chassis
Before You Install the CTP1000 Platform
Installing the CTP1000 Platform in Freestanding Mode
Installing the CTP1000 Platform in a Rack
Cabling
Cabling the CTP1000 Platform Overview
Required Tools, Wires, and Cables for the CTP1000 Platform
CTP Fast Ethernet and Power Cables
Fast Ethernet Cables
DC Power Cables
Powering On
Before You Power On the CTP1000 Platform
Powering On the CTP1000 Platform
Powering Off the CTP Platform
Configuration
Accessing the CTP1000 Platform
Setting Up Management Access on the CTP1000 Platform
CTP1000 Console Port Setup
Using HyperTerminal with the CTP1000 Platform
Connecting Directly to the CTP1000 Platform
CTP1000 Platform SSH Setup
Maintenance
Maintaining Components
Cleaning the CTP Platform
Required Tools for Maintaining the CTP Platform
Storing CTP Modules and Other Components
Product Reclamation and Recycling
Product Reclamation and Recycling Program
Packing and Returning Hardware
Return Procedure
Returning CTP Products for Repair or Replacement
Troubleshooting
Troubleshooting Power Failures
CTP Platform Does Not Power On
CTP Platform Shuts Down
Contacting Customer Support
Contacting Customer Support
Locating CTP Component Serial Numbers
Information You Might Need to Supply to JTAC
Index
Index

Modified: 2015-11-22