Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 

Equal Cost Multiple-Path Recommended Instructions

 

Following is a high-level, sequential outline of the Equal Cost Multiple-Paths features and the associated, recommended procedures.

  • Open the Equal Cost Multi-Paths Report as described in step 3 and step 4.

  • View the equivalent cost paths between two nodes as described in step 5 to step 9.

  • Create sub-flows between two nodes as described in step 1 to step 4.