End-to-End BERT for CTP Bundles Overview
This topic provides an overview of how to set up end-to-end BERT for CTP bundles.
Figure 18 shows the normal data flow through the network. BERT is disabled.

To set up end-to-end BERTS for CTP bundles:
- To send BERT transmissions to the network, start BERT
injection on each CTP bundle toward the IP network as shown in Figure 19.
Figure 19: BERT Transmission to the Network - To receive BERT reception from the network, start BERT
reception on each bundle from the IP network as shown in Figure 20.
Figure 20: End-to-End BERT Reception
The result is that end-to-end BERT transmission and reception are running as shown in Figure 21.
