Users with the Operating Company (OpCo) Administrator role can:
Assign a CSO license to one or more tenants.
Update the assignment of a CSO license that was previously assigned to one or more tenants.
Unassign a CSO license that was previously assigned to a tenant.
To assign a CSO license that is not yet assigned to a tenant:
The CSO Licenses page appears.
The Assign CSO License page appears.
CSO validates the quantities that you assigned against the total quantity for the license:
If the sum of assigned quantities is greater than the total quantity, an error message is displayed. You must then modify the assigned quantities to proceed.
If the sum of assigned quantities is less than or equal to the total quantity, a job is triggered. You are returned to the CSO Licenses page and a confirmation message is displayed on the top of the page. After the job completes successfully, the CSO Licenses page displays the updated information in the Available and Assigned columns.
Table 153: Fields on the Assign CSO License page
Field | Description |
---|---|
License Information | Displays the following information for the license:
|
License Assignment | |
Device Quantity | Displays the total quantity that can be assigned to tenants. |
Available | Displays the available quantity that can be allocated to tenants. |
Tenants List | ProcedureTo assign the license to one or more tenants:
|
For a CSO license that is already assigned to one or more tenants, to update or unassign the license assignment:
The CSO Licenses page appears.
The Assign CSO License page appears.
To update the license assignment:
The modification that you made is displayed in the grid.
To unassign the license assignment:
A popup appears asking you to confirm the unassign operation.
The license is unassigned from the tenant that you selected and the tenant is removed from the grid.
CSO validates the modifications against the total device quantity for the license:
If the sum of assigned quantities is greater than the total quantity, an error message is displayed. You must then modify the assigned quantities to proceed.
If the sum of assigned quantities is less than or equal to the total quantity, a job is triggered and you are returned to the CSO Licenses page. A confirmation message is displayed on the top of the page.
After the job completes successfully, the CSO Licenses page displays the updated information in the Available and Assigned columns.