Use this page to create SD-WAN report definitions for all sites in a tenant and generate the report based on the definitions. You can also schedule a report generation and add one or more recipients to whom you want to send the reports.
The SD-WAN tenant performance report includes SLA performance of the following SLA events:
Top Applications By Bandwidth
Top Sites Not Meeting SLA
Top Sites Meeting SLA with Switching
Sites Meeting SLA without Switching
Note Only users with the SP Administrator or Tenant Administrator role can create SD-WAN tenant performance report definitions.
To create SD-WAN tenant report definition:
The SD-WAN Report Definitions page appears.
The Create SD-WAN Tenant Performance Report Definition page appears.
An SD-WAN tenant performance report definition is created and saved in the report definitions page.
Alternatively, if you want to discard your changes, click Cancel.
Table 183: Fields on the Create Tenant Performance Report Definition
Field | Description |
|---|---|
| General | |
Report Name | Enter a unique string of alphanumeric characters and some special characters (: . -). No spaces are allowed and the maximum length is 63 characters. |
Description | Enter a description for the report definition; maximum length is 1024 characters. |
| Content | |
Duration | Specify the duration (custom, last 24 hours, last 7 days, or last 30 days) for which the report is generated. When you select the custom option, you must specify the From and To date (in MM/DD/YYYY and HH:MM:SS formats). |
Note: The From and To fields are populated only when you select the Custom duration. | |
From | Specify the start date and time from which the report should be generated. |
To | Specify the end date and time up to which the report should be generated. |
Number of Top Logs | Enter the number of SLA events (1 through 20) that you want to retrieve and display for each section in the report. |
Report Content | Select the content that you want to view in the report.
|
| Schedule Report | |
Add Schedule | Click Add Schedule to schedule the report generation. The Add Report Schedule page is displayed. Specify whether you want to generate the report immediately or schedule it for a later date and time.
|
| Email Recipients | |
Add Email Recipients | Click Add Email Recipients to add e-mail addresses of recipients to whom you want to send the SD-WAN reports. The Add Recipients page is displayed.
|