Prerequisites
The following prerequisites are necessary before you install and configure the BTI7800:
- All chassis and common equipment are installed with terminated and labeled power cables, power plant and fusing is installed, and LAN cables between the chassis and the local switch are labeled.
- Installation team has access to all tools and additional equipment required to perform the procedures in this guide: screw drivers, optical power meter, fiber cleaning kit, label maker, RJ45 cable (or serial cable if preferred), spare attenuation pads (3dB, 5dB, 10dB, 15dB), optical spectrum analyzer (OSA) if required.
- The installation team has a copy of the installation and commissioning report. This report can be obtained from the engineer responsible for the network design.
- The installation team has access to a copy of this guide and reviewed the safety and fiber management sections.