Statement introduced in Release 9.5 of JUNOS software.
Specify the authentication method for connection to a Global System for Mobile Communications (GSM) cellular network.
This statement is supported on SRX 210 devices.
pap—Password Authentication Protocol.
chap—Challenge Handshake Authentication Protocol.
none—No authentication method is used.
For configuration instructions and examples, see the JUNOS Software Interfaces and Routing Configuration Guide.
interface—To view this statement in the configuration.
interface-control—To add this statement to the configuration.