Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Technical Documentation
 
CLI Explorer New
 
Content Explorer New
 
Documentation Help New
 
Enterprise MIBs
 
EOL Documentation
 
Feature Explorer Login required New
 
Glossary
 
Portable Libraries
 
Home > Support > Technical Documentation > C Series Controllers > Installing the C Series Controller in a Two-Post Rack
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...
 

Related Documentation

  • C Series
  • C3000 and C5000 Site Preparation Checklist
  • C3000 and C5000 Controller Rack Requirements
  • C3000 and C5000 Clearance Requirements for Airflow and Hardware Maintenance
  • C3000 and C5000 Installation Summary
 

Installing the C Series Controller in a Two-Post Rack

To install the C Series Controller in a two-post rack, you must attach the mounting hardware for center mounting. Center mounting allows the controller to be midmounted so that there is even clearance on the front and rear of the rack.

To mount the controller using the center-mount option:

  1. Remove the two front-mount rails from either side of the chassis.
  2. Insert one midmount bracket to the center on either side of the chassis.
  3. Attach the chassis to the equipment rack, and insert the other two midmount brackets on either side of the system to secure the chassis to the backs of the post (see Figure 1).
  4. Verify that the mounting screws on one side of the rack are aligned with the mounting screws on the opposite side and that the appliance is level.

Figure 1: Installing the C Series Controller in a Two-Post Rack

Installing the C Series
Controller in a Two-Post Rack
 

Related Documentation

  • C Series
  • C3000 and C5000 Site Preparation Checklist
  • C3000 and C5000 Controller Rack Requirements
  • C3000 and C5000 Clearance Requirements for Airflow and Hardware Maintenance
  • C3000 and C5000 Installation Summary
 

Published: 2013-03-20

 
  • About Juniper
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Green Networking
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Developers
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2013 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out