Routine Maintenance Procedures for the SRX5800 Services Gateway
Purpose
For optimum services gateway performance, perform preventive
maintenance procedures regularly.
Action
- Inspect the installation site for moisture, loose wires
or cables, and excessive dust. Make sure that airflow is unobstructed
around the device and into the air intake vents.
- Check the status-reporting devices on the craft interface—System
alarms and LEDs.
- Inspect the air filter at the bottom front of the services
gateway, replacing it every six months for optimum cooling system
performance. Do not run the device for more than a few minutes without
the air filter in place.
Published: 2011-03-29