Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Support
Technical Documentation
Content Explorer New
 
Enterprise MIBs
 
EOL Documentation
 
File Format Help
 
Glossary
 
Portable Libraries
 
 
Home > Support > Technical Documentation > Site Preparation Checklist for the SRX650 Services Gateway
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...

Documentation Search

Advanced Search |  Search Tips
 

Related Documentation

  • SRX650 Services Gateway Chassis
  • Installation Overview for the SRX650 Services Gateway
  • General Site Installation Guidelines for the SRX650 Services Gateway
 

Site Preparation Checklist for the SRX650 Services Gateway

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for installing the SRX650 Services Gateway.

Table 1: Site Preparation Checklist for SRX650 Services Gateway Installation

Item or Task

Additional Information

Performed By

Date

Notes

Power

Measure distance between external power sources and device installation site.

SRX650 Services Gateway Electrical Wiring Guidelines

   

Locate sites for connection of system grounding.

Grounding the SRX650 Services Gateway

   

Calculate the power consumption and requirements.

SRX650 Services Gateway AC Power Supply Electrical Specifications and SRX650 Services Gateway DC Power Supply Electrical Specifications

   

Environment

Verify that environmental factors such as temperature and humidity do not exceed device tolerances.

SRX650 Services Gateway Environmental Specifications

   

Rack Installation

Verify that your rack meets the minimum requirements.

SRX650 Services Gateway Rack Size and Strength Requirements

   

Plan rack location, including required space clearances.

SRX650 Services Gateway Spacing of Mounting Bracket and Flange Holes

   

Secure the rack to the floor and building structure.

Connecting the SRX650 Services Gateway to the Building Structure

   

Cabinet Installation

Verify that your cabinet meets the minimum requirements.

SRX650 Services Gateway Cabinet Size and Clearance Requirements

   

Plan the cabinet location, including required space clearances.

SRX650 Services Gateway Cabinet Airflow Requirements

   

Cables

Acquire cables and connectors.

Interface Cabling and Wiring Specifications for the SRX650 Services Gateway

   

Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

    

Plan the cable routing and management.

    
 

Related Documentation

  • SRX650 Services Gateway Chassis
  • Installation Overview for the SRX650 Services Gateway
  • General Site Installation Guidelines for the SRX650 Services Gateway
 

Published: 2010-12-01

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out