Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Support
Technical Documentation
Content Explorer New
 
Enterprise MIBs
 
EOL Documentation
 
File Format Help
 
Glossary
 
Portable Libraries
 
 
Home > Support > Technical Documentation > Packing the SRX650 Services Gateway for Shipment
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...

Documentation Search

Advanced Search |  Search Tips
 

Related Documentation

  • Return Procedure for the SRX650 Services Gateway
  • Packing the SRX650 Services Gateway Components for Shipment
  • Required Tools and Parts for Packing the SRX650 Services Gateway
 

Packing the SRX650 Services Gateway for Shipment

To pack the SRX650 Services Gateway for shipment:

  1. Retrieve the shipping carton and packing materials in which the services gateway was originally shipped. If you do not have these materials, contact your Juniper Networks representative about approved packaging materials.
  2. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect the strap to the ESD point on the chassis or to an outside ESD point if the device is disconnected from earth ground. For more information about ESD, see Preventing Electrostatic Discharge Damage to the SRX650 Services Gateway.
  3. On the console or other management device connected to the services gateway, enter the CLI operational mode and issue the following command to shut down the services gateway software:

    user@host> request system halt

    Wait until a message appears on the console confirming that the operating system has halted.

  4. Shut down power to the services gateway by pressing the Power button on the front of the services gateway.
  5. Disconnect power from the services gateway.
  6. Remove the cables that connect to all external devices.
  7. Remove the SRE (and GPIMs, if any have been installed) from the services gateway.
  8. If the services gateway is installed in a rack, have one person support the weight of the services gateway while another person unscrews and removes the mounting screws.
  9. Place the services gateway in the shipping carton.
  10. Cover the services gateway with an ESD bag, and place the packing foam on top of and around the device.
  11. Replace the accessory box on top of the packing foam.
  12. Securely tape the box closed.
  13. Write the Return Materials Authorization (RMA) number on the exterior of the box to ensure proper tracking.
 

Related Documentation

  • Return Procedure for the SRX650 Services Gateway
  • Packing the SRX650 Services Gateway Components for Shipment
  • Required Tools and Parts for Packing the SRX650 Services Gateway
 

Published: 2010-12-01

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out