Unpacking the T1600 Router
The router is
shipped in a wooden crate. A wooden pallet forms the base of the crate.
The router chassis is bolted to this pallet. Quick Start installation
instructions and a cardboard accessory box are also included in the
shipping crate.
The shipping crate measures 50 in. (127 cm) high, 30 in. (76.2 cm) wide, and 41 in. (104 cm) deep.
The total weight of the crate containing the router and accessories
can range from 537 lb (244 kg) to 756 lb (343 kg).
 | Note:
The router is maximally protected inside the shipping
crate. Do not unpack it until you are ready to begin installation. |
To unpack:
- Move the shipping crate to a staging area as close to
the installation site as possible, where you have enough room to remove
the components from the chassis. While the chassis is bolted to the
pallet, you can use a forklift or pallet jack to move it.
- Position the shipping crate with the arrows pointing up.
- Open all the latches on the shipping crate.
- Remove the front door of the shipping crate cover and
set it aside.
- Slide the remainder of the shipping crate cover off the
pallet.
- Remove the foam covering the top of the router.
- Remove the accessory box and the Quick Start documentation.
- Verify the parts received.
- Remove the vapor corrosion inhibitor (VCI) packs attached
to the pallet, being careful not to break the VCI packs open.
- To remove the brackets holding the chassis on the pallet,
use a 1/2-in. socket wrench and a number 2 Phillips screwdriver
to remove the bolts and screws from the brackets.
- Store the brackets and bolts inside the accessory box.
- Save the shipping crate cover, pallet, and packing materials
in case you need to move or ship the router at a later time.
- Proceed with the installation.
Figure 1: Contents of the T1600 Shipping Crate
Published: 2011-12-20