Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Support
Technical Documentation
Content Explorer New
 
Enterprise MIBs
 
EOL Documentation
 
File Format Help
 
Glossary
 
Portable Libraries
 
 
Home > Support > Technical Documentation > Installing the SRE on the SRX650 Services Gateway
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...

Documentation Search

Advanced Search |  Search Tips
 

Related Documentation

  • SRX650 Services Gateway Back Panel
  • Removing the SRE from the SRX650 Services Gateway
  • SRX650 Services Gateway Services and Routing Engine 6
  • Powering On the SRX650 Services Gateway
 

Installing the SRE on the SRX650 Services Gateway

The SRE installs at the back panel of the chassis in the horizontal slots labeled SRE0 or SRE1.0/1.1.

Caution: The SRE is not hot-swappable. You must power off the services gateway before removing or inserting an SRE.

To install the SRE:

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to the ESD point on the chassis.
  2. Power off the services gateway.
  3. If a blank panel is installed in the SRE slot, remove it.
  4. Carefully align the sides of the SRE with the guides inside the chassis. Also ensure that the locking levers on each side of the SRE are in the open position.
  5. Slide the SRE into the chassis until you feel resistance, carefully ensuring that it is correctly aligned (see Figure 1).
  6. With your thumbs, push the locking levers into place to fully lock the SRE into the slot.

    Warning: If the locking levers are not aligned properly with the edge of the SRE slot, the SRE will not be properly seated into the SRE backplane receptacle.

  7. Use a number 2 Phillips screwdriver to tighten the captive screws on each side of the locking levers.
  8. Power on the services gateway and verify that the SRE LED indicators on the chassis and the SRE LED are green.

Figure 1: Installing the Services and Routing Engine (SRE)

Image g032707.gif
 

Related Documentation

  • SRX650 Services Gateway Back Panel
  • Removing the SRE from the SRX650 Services Gateway
  • SRX650 Services Gateway Services and Routing Engine 6
  • Powering On the SRX650 Services Gateway
 

Published: 2010-12-01

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out