After you have prepared your installation site, you are ready to unpack and install the services gateway. It is important to proceed through the installation process as shown in Table 1.
Table 1: Installation Process Order for the SRX220 Services Gateway
Step | Task | For more information, see |
|---|---|---|
1 | Review the relevant safety guidelines. | SRX220 Services Gateway General Safety Guidelines and Warnings |
2 | Verify that you have prepared your site for the installation of the services gateway, using the checklist. | |
3 | Unpack the services gateway, and verify that you have received all the parts. | |
4 | Prepare the services gateway for installation. | Preparing the SRX220 Services Gateway for Rack-Mount and Wall-Mount Installation |
5 | Install the services gateway. | |
6 | Connect cables to external devices. | Connecting and Organizing Interface Cables for the SRX220 Services Gateway |
7 | Connect the grounding cables. | |
8 | Power on the services gateway. |