Installing an SRX Clustering Module in the SRX3600 Services
Gateway
You install the SRX Clustering Module (SCM)
in the RE1 slot on the rear panel of the services gateway. To install
the SCM:
- Attach an ESD grounding strap to your bare wrist
and connect the strap to one of the ESD points on the chassis. For
more information about ESD, see Preventing Electrostatic Discharge Damage to the SRX3600 Services Gateway.
- If you have not already done so, power off the
services gateway by pressing the Power button on the front panel of
the Switch Fabric Board (SFB) for three to five seconds.
The PWR LED blinks to show you that the services gateway
is shutting down. Wait for the services gateway to shut down before
proceeding.
- Loosen the captive screws at each end of the blank
faceplate over the RE1 slot and remove the faceplate.
- Place the SCM on an
antistatic mat or remove it from its electrostatic bag and place it
on the bag.
- Press both of the ejector handles on the SCM faceplate
outward to release them.
- Orient the SCM so that its faceplate faces you.
Slide the SCM all the way into the card cage until you feel resistance.
See Figure 1.
Figure 1: Installing the SCM in the SRX3600
Services Gateway
- Press both of the ejector handles inward to seat the SCM.
- Tighten the screws on
either side of the SCM faceplate.
Published: 2011-09-21