Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Support
Technical Documentation
Content Explorer New
 
Enterprise MIBs
 
EOL Documentation
 
File Format Help
 
Glossary
 
Portable Libraries
 
 
Home > Support > Technical Documentation > T Series Routers > T640 Router Hardware > Installing a T640 SCG
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...
 

Related Documentation

  • T Series
  • T640 SONET Clock Generators (SCGs) Description
  • T640 SONET Clock Generators (SCGs) LEDs
  • Maintaining the T640 SCGs
  • T640 Preventing Electrostatic Discharge Damage
 

Installing a T640 SCG

To install a replacement SCG (see Figure 1):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
  2. Carefully align the sides of the SCG with the guides in the SCG slot.
  3. Grasp the SCG by its handle, and slide it straight into the chassis until it contacts the midplane.
  4. Tighten the captive screws on the corners of the SCG faceplate.
  5. To bring the SCG online, press the online/offline button until the green OK LED lights.
  6. To verify that the SCG is installed correctly and is functioning normally, check the LEDs on the SCG faceplate. The green OK LED should light steadily. If the SCG is master, the blue MASTER LED should also light steadily.

    To check the status of the SCGs, use the following CLI command:

    user@host> show chassis environment scg

    For more information about using the CLI, see the Junos OS manuals.

  7. If an external clocking device was connected to one or both RJ-48 ports, reconnect the cables.

Figure 1: Installing an SCG

Installing an SCG
 

Related Documentation

  • T Series
  • T640 SONET Clock Generators (SCGs) Description
  • T640 SONET Clock Generators (SCGs) LEDs
  • Maintaining the T640 SCGs
  • T640 Preventing Electrostatic Discharge Damage
 

Published: 2011-12-19

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out