Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Support
Technical Documentation
Content Explorer New
 
Enterprise MIBs
 
EOL Documentation
 
File Format Help
 
Glossary
 
Portable Libraries
 
 
Home > Support > Technical Documentation > SRX Series Services Gateways > SRX5800 > Installing an SRX5800 Services Gateway SCB
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...
 

Related Documentation

  • Preventing Electrostatic Discharge Damage to the SRX5800 Services Gateway
  • Powering Off the SRX5800 Services Gateway
  • Taking the SRX5800 Services Gateway Host Subsystem Offline
  • Operating and Positioning the SRX5800 Services Gateway SCB Ejectors
  • Removing an SRX5800 Services Gateway SCB
  • Replacing the SRX5800 Services Gateway Routing Engine
  • Replacing the Management Ethernet Cable on an SRX5800 Services Gateway
 

Installing an SRX5800 Services Gateway SCB

To install an SCB (see Figure 1):

  1. Attach an ESD grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
  2. Power-off the services gateway.
  3. Carefully align the sides of the SCB with the guides inside the chassis.
  4. Slide the SCB into the chassis until you feel resistance, carefully ensuring that it is correctly aligned.
  5. Grasp both ejector handles and rotate them simultaneously clockwise until the SCB is fully seated.
  6. Place the ejector handles in the proper position, vertically and toward the center of the board.
  7. Power-on the services gateway.
  8. To verify that the SCB is functioning normally, check the LEDs on its faceplate. The green OK/FAIL LED should light steadily a few minutes after the SCB is installed. If the OK/FAIL LED is red, remove and install the SCB again. If the OK/FAIL LED still lights steadily, the SCB is not functioning properly. Contact your customer support representative.

    To check the status of the SCB:

    user@host> show chassis environment cb
    CB 0 status:
      State                      Online Master
      Temperature                30 degrees C / 86 degrees F
      Power 1
        1.2 V                     1202 mV
        1.5 V                     1511 mV
        1.8 V                     1798 mV
        2.5 V                     2481 mV
        3.3 V                     3306 mV
        5.0 V                     4956 mV
        12.0 V                   12084 mV
        1.25 V                    1250 mV
        3.3 V SM3                 3287 mV
        5.0 V RE                  5046 mV
        12.0 V RE                11910 mV
      Power 2
        11.3 V bias PEM          11292 mV
        4.6 V bias MidPlane       4833 mV
        11.3 V bias FPD          11156 mV
        11.3 V bias POE 0        11253 mV
        11.3 V bias POE 1        11272 mV
      Bus Revision               42
      FPGA Revision              1
    CB 1 status:
      State                      Online
      Temperature                31 degrees C / 87 degrees F
      Power 1
        1.2 V                     1205 mV
        1.5 V                     1508 mV
        1.8 V                     1817 mV
        2.5 V                     2507 mV
        3.3 V                     3306 mV
        5.0 V                     5053 mV
        12.0 V                   12200 mV
        1.25 V                    1256 mV
        3.3 V SM3                 3306 mV
        5.0 V RE                  5091 mV
        12.0 V RE                    0 mV
      Power 2
        11.3 V bias PEM          11214 mV
        4.6 V bias MidPlane       4821 mV
        11.3 V bias FPD          11350 mV
        11.3 V bias POE 0        11350 mV
        11.3 V bias POE 1        11330 mV
      Bus Revision               42
      FPGA Revision              0

Figure 1: Installing an SCB

Image g030227.gif
 

Related Documentation

  • Preventing Electrostatic Discharge Damage to the SRX5800 Services Gateway
  • Powering Off the SRX5800 Services Gateway
  • Taking the SRX5800 Services Gateway Host Subsystem Offline
  • Operating and Positioning the SRX5800 Services Gateway SCB Ejectors
  • Removing an SRX5800 Services Gateway SCB
  • Replacing the SRX5800 Services Gateway Routing Engine
  • Replacing the Management Ethernet Cable on an SRX5800 Services Gateway
 

Published: 2011-03-29

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out