Installing an MX960 AC Power Supply
To install an AC power supply (see Figure 1):
- Attach an electrostatic discharge (ESD) grounding strap
to your bare wrist, and connect the strap to one of the ESD points
on the chassis.
- Move the AC input switch in the chassis
above the empty power supply slot to the off (O) position.
- Ensure that the release lever below the empty power
supply slot is locked in the counterclockwise position (see Figure 1).
If necessary, pull the spring-loaded locking pin in the release
lever away from the chassis and turn the release lever counterclockwise
until it stops. Let go of the locking pin in the release lever. Ensure
that the pin is seated inside the corresponding hole in the chassis.
- Using both hands, slide the power supply straight
into the chassis until the power supply is fully seated in the chassis
slot. The power supply faceplate should be flush with any adjacent
power supply faceplates.
The small tab on the metal housing that is controlled by the
release lever must be inside of the corresponding slot at the bottom
of the power supply (see Figure 1). This tab is used to pull the power supply down in the chassis
slot, prior to removing the power supply.
- While firmly pushing the handle on the power supply
faceplate with one hand, use your other hand to pull the spring-loaded
locking pin in the release lever away from the chassis and turn the
release lever clockwise until it stops.
- Let go of the locking pin in the release lever.
Ensure that the pin is seated inside the corresponding hole in the
chassis.
- Move the AC input switch in the chassis above the
power supply to the on (—) position and observe the
status LEDs on the power supply faceplate. If the power supply is
correctly installed and functioning normally, the AC OK and DC OK LEDs light steadily, and the PS FAIL LED is not lit.
Figure 1: Installing
an AC Power Supply
Published: 2011-09-08