Installing an I/O Card with Copper Media Interfaces in the
SRX3600 Services Gateway
To install an IOC that supports copper media
interfaces:
- Attach an ESD grounding strap to your bare wrist
and connect the strap to one of the ESD points on the chassis. For
more information about ESD, see Preventing Electrostatic Discharge Damage to the SRX3600 Services Gateway.
- If you have not already done so, power off the
services gateway by pressing the Power button on the front panel of
the Switch Fabric Board (SFB) for three to five seconds.
The PWR LED blinks to show you that the services gateway
is shutting down. Wait for the services gateway to shut down before
proceeding.
- Place the IOC on an antistatic mat or remove it
from its electrostatic bag.
- Identify the slot on the services gateway where
it will be installed. You can only install IOCs in front-panel slots.
- Orient the IOC so that the faceplate faces you.
Slide the IOC all the way into the card cage until you feel resistance.
- Tighten the screws on either side of the card.
- If you are installing additional IOCs at this time,
repeat steps 3 through 6, then continue with the following steps to
connect the appropriate cables.
- Insert the appropriate cables into the cable connector
ports on each IOC. Secure the cables so that they are not supporting
their own weight. Place excess cable out of the way in a neatly coiled
loop. Placing fasteners on a loop helps to maintain its shape.
Figure 1: Installing an IOC with Copper Interfaces
 | Warning:
Never lift the services gateway using the handles on
the front panels of the IOCs or other CFM cards. The handles might
come off, causing the chassis to drop and inflicting possible grave
injury. |
Published: 2011-09-21