Powering On an EX8200 Switch
Before you power
on the switch, ensure that:
Ensure that you have the following parts
and tools available to power on the switch:
- An electrostatic discharge (ESD) grounding strap.
- An external management device such as a PC.
- A cable to connect the external management device to the
master Switch Fabric and Routing Engine (SRE) module's console (CON)
port or management (MGMT) port in an EX8208 switch or the master
Routing Engine (RE) module’s console (CON) port or management
(MGMT) port in an EX8216 switch.
For connecting a management device to the console port, see Connecting an EX Series Switch to a Management Console. For connecting a management device to the management port, see Connecting an EX Series Switch to a Network for Out-of-Band Management.
To power on the switch:
- Attach the ESD grounding strap to your bare
wrist and connect the strap to the ESD point on the chassis.
- Connect the external management device to the master
SRE or master RE module's management (MGMT) port.
- Turn on the power to the external management device.
- Ensure that the power supplies are fully inserted
in the chassis and that each of their handles is flush against the
faceplate.
- Ensure that the source power cord is inserted securely
into the appliance inlet for each AC power supply.
If you are using DC power supplies, ensure that the source power
cables are connected to the appropriate terminal: the positive (+)
source cable to the return terminal (RTN) and the negative (-) source
cable to the input terminal (-48 VDC).
- Switch on the site circuit breakers.
- Flip a power supply’s Enable switch
to the on position (ON). See Figure 1. Observe the power supply faceplate LEDs. If the power supply
is installed correctly and functioning normally, the INPUT OK / IN OK and OUTPUT OK / OUT OK LEDs light
and remain constantly lit. The FAIL LED does not light.
Figure 1: Flip the Enable Switch
to the ON position
- Repeat
Step 7 for the remaining power supplies installed in the switch.
- On the external management device, monitor the
startup process to ensure that the system boots properly.
 | Note:
After you power on a power supply, wait for at least 60
seconds before you turn it off. After you power off a power supply,
wait for at least 60 seconds before you turn it back on. If the system is completely powered off when you switch on a
power supply, the SRE or RE module boots as the power supply completes
its startup sequence. After you power on a power supply, it can take up to 60 seconds
for status indicators such as power supply LEDs and the show chassis operational mode CLI command display to indicate that the power supply
is functioning normally. Ignore any error indicators that might appear
during the first 60 seconds. |
Published: 2011-02-14