Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Download Software
Research a Problem Login required
Case Management Login required
Contract & Product Management Login required
Technical Documentation
Documentation Archive
Enterprise MIBs
File Format Help
Glossary
Portable Libraries
End-of-Life Products
Contact Support
Guidelines and Policies
Security Resources
Home > Support > Technical Documentation > T Series Routers > T320 Router Hardware > Reinstalling T320 Components in the Chassis
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...
 

Related Documentation

  • T Series
  • Preventing Electrostatic Discharge Damage to a T320 Router
  • T320 Flexible PIC Concentrators (FPCs) Description
  • T320 Switch Interface Boards (SIBs) Description
  • T320 T Series Control Board (T-CB) Description
  • T320 Power System Description
  • T320 Cooling System Description
 

Reinstalling T320 Components in the Chassis

After the T320 router is installed in the rack, you reinstall the removed components before booting and configuring the router. The following procedures describe how to reinstall components in the chassis, first in the rear and then in the front:

  1. Reinstalling the T320 Rear Fan Tray
  2. Reinstalling the T320 SCGs
  3. Reinstalling the T320 Control Boards
  4. Reinstalling the T320 SIBs
  5. Reinstalling the T320 Power Supplies
  6. Reinstalling the T320 FPCs
  7. Reinstalling T320 Front Fan Trays
  8. Reinstalling the T320 Cable Management System

Reinstalling the T320 Rear Fan Tray

To reinstall the rear fan tray (see Figure 1):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to an approved site ESD grounding point. See the instructions for your site.
  2. Grasp the fan tray by its handles and insert it straight into the chassis.
  3. Tighten the captive screws on the top and bottom of the fan tray faceplate to secure it in the chassis.

Figure 1: Reinstalling the Rear T320 Fan Tray

Reinstalling
the Rear T320 Fan Tray

Reinstalling the T320 SCGs

To reinstall the SCGs (see Figure 2):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
  2. Carefully align the sides of the SCG with the guides in the SCG slot.
  3. Grasp the SCG by its handle and slide it straight into the chassis until it contacts the midplane.
  4. Tighten the captive screws on the corners of the SCG faceplate.
  5. Repeat the procedure to reinstall the remaining SCG.

Figure 2: Reinstalling a T320 SCG

Reinstalling a T320 SCG

Reinstalling the T320 Control Boards

To reinstall the control boards (see Figure 3):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to an approved site ESD grounding point. See the instructions for your site.
  2. Carefully align the sides of the control board with the guides inside the chassis.
  3. Slide the control board into the chassis, carefully ensuring that it is correctly aligned.
  4. Grasp both ejector handles and press them inward to seat the control board.
  5. Tighten the captive screws on the ejector handles, using a Phillips (+) screwdriver, number 2.
  6. Repeat the procedure to reinstall the remaining control board.

Figure 3: Reinstalling a Control Board

Reinstalling a Control Board

Reinstalling the T320 SIBs

To reinstall the SIBs (see Figure 4):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to an approved site ESD grounding point. See the instructions for your site.
  2. Place one hand underneath the SIB to support it. With the other hand, hold one of the ejector handles on the SIB faceplate.
  3. Carefully align the sides of the SIB with the guides inside the chassis.
  4. Slide the SIB into the chassis, carefully ensuring that it is correctly aligned.
  5. Grasp both ejector handles and press them inward to seat the SIB.
  6. Tighten the captive screws on the ejector handles.
  7. Repeat the procedure for each of the remaining SIBs.

Figure 4: Reinstalling a SIB

Reinstalling a SIB

Reinstalling the T320 Power Supplies

If the T320 router has two power supplies, reinstall the lower power supply first, then the upper power supply. To reinstall the power supplies (see Figure 5):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
  2. Switch the circuit breaker on the power supply faceplate to the off position (O).
  3. Using both hands, slide the power supply into the chassis until you feel resistance.
  4. Twist the ejector handles at the upper corners of the power supply faceplate clockwise until they stop.
  5. Tighten the captive screws at the lower corners of the power supply faceplate to secure the power supply in the chassis.
  6. Repeat the procedure for the upper power supply.

Figure 5: Reinstalling a T320 Power Supply

Reinstalling a
T320 Power Supply

Reinstalling the T320 FPCs

To reinstall FPCs (see Figure 6):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to an approved site ESD grounding point. See the instructions for your site.
  2. Using the list you created when you removed the FPCs, locate the slot in the FPC card cage in which you plan to install the FPC.
  3. Inspect the slots in the FPC card cage to verify that there are no missing or bent pins on the midplane.
  4. Inspect each FPC to verify that the connectors are not misaligned or damaged.

    Caution: When the FPC is out of the chassis, do not hold it by the ejector handles, bus bars, or edge connectors. They cannot support its weight.

  5. Lift the FPC into place and carefully align first the bottom and top of the FPC with the guides inside the card cage. Be sure the FPC is right-side up, with the components on the right of the FPC.
  6. Gently rest the bottom edge of the FPC on the bottom edge of the slot opening, making contact a short distance forward of the power connector.

    Caution: Take care not to bend or otherwise damage the power connector prongs.

  7. Slide the FPC all the way into the card cage until you feel resistance.
  8. Starting with the ejector handles on the FPC faceplate nearly horizontal, simultaneously turn both ejector handles clockwise to seat the FPC.
  9. If you are installing a Type 2 FPC or Type 3 FPC, tighten the screws inside the ejector handles to secure the FPC. Do not overtighten them.
  10. Repeat the procedure to reinstall each remaining FPC.

Figure 6: Reinstalling an FPC

Reinstalling an FPC

Reinstalling T320 Front Fan Trays

To reinstall the standard front fan trays (see Figure 7):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to an approved site ESD grounding point. See the instructions for your site.
  2. Grasp one of the fan trays by its handles and insert it straight into the chassis.
  3. Tighten the captive screw on each side of the fan tray faceplate to secure it in the chassis.
  4. Repeat the procedure to reinstall the remaining fan tray.

Figure 7: Reinstalling a Front Fan Tray

Reinstalling
a Front Fan Tray

Reinstalling the T320 Cable Management System

To reinstall the cable management system:

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
  2. Position the cable management system on the studs on the lower front of the chassis.
  3. Insert the nuts through the holes in the cable management system onto the studs on the chassis.
  4. Using a 3/8-in. nut driver, tighten the nuts securely.
 

Related Documentation

  • T Series
  • Preventing Electrostatic Discharge Damage to a T320 Router
  • T320 Flexible PIC Concentrators (FPCs) Description
  • T320 Switch Interface Boards (SIBs) Description
  • T320 T Series Control Board (T-CB) Description
  • T320 Power System Description
  • T320 Cooling System Description
 

Published: 2011-12-19

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out