Replacing an M120 CB
To replace a CB, perform the
following procedures:
Removing an M120 CB
The router can have one or two CBs. They are
located on either side of the FEBs in the rear of the chassis in the
slots marked CB0 and CB1. With an RE installed,
each CB weighs approximately 6.9 lb (3.1 kg).
 | Caution:
Before you replace a CB, you must take the host subsystem
offline. If there is only one host subsystem, taking the host subsystem
offline shuts down the router. See Taking the M120 Host Subsystem Offline. |
 | Caution:
If the CB to be replaced is associated with the Routing
Engine currently functioning as the master Routing engine, switch
it to the backup before removing the CB. See Taking the M120 Host Subsystem Offline. |
To remove a CB (see Figure 1):
- Take the host subsystem offline. See Taking the M120 Host Subsystem Offline.
- Place an electrostatic bag or antistatic mat on
a flat, stable surface.
- Attach an electrostatic discharge (ESD) grounding strap
to your bare wrist, and connect the strap to one of the ESD points
on the chassis.
- Loosen the captive screws on the ejector
handles, using a Phillips (+) screwdriver, number 2.
- Simultaneously rotate the ejector handles counterclockwise
to unseat the CB.
- Grasp the ejector handles and slide the CB about
halfway out of the chassis.
- Place one hand underneath the CB to support it
and slide it completely out of the chassis.
- Place the CB on the antistatic mat.
- If you are not replacing the CB now, install a
blank panel over the empty slot.
Figure 1: Removing an M120 CB
Installing an M120 CB
To install a CB (see Figure 2):
- Attach an electrostatic discharge (ESD) grounding strap
to your bare wrist and connect the strap to an approved site ESD grounding
point. See the instructions for your site.
- Carefully align the sides of the CB with the guides inside
the chassis.
- Slide the CB into the chassis, carefully ensuring
that it is correctly aligned.
- Grasp both ejector handles and rotate them simultaneously
clockwise until the CB is fully seated.
- Tighten the captive screws on the ejector handles,
using a Phillips (+) screwdriver, number 2.
- To verify that the CB is functioning normally, check the LEDs on
its faceplate. The green OK LED should light steadily a few
minutes after the CB is installed. If the FAIL LED is lit
steadily, remove and install the CB again. If the FAIL LED
still lights steadily, the CB is not functioning properly. Contact
your customer support representative.
To check the status
of the CB, use the CLI command:
user@host> show chassis environment cb
Figure 2: Installing an M120 CB
Published: 2011-02-23