The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for QFX3500 device installation.
Table 1: Site Preparation Checklist
Item or Task | For More Information | Performed By | Date |
|---|---|---|---|
| Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | Environmental Requirements and Specifications for the QFX3500 Device |
|
|
| Power | |||
Measure distance between external power sources and device installation site. |
|
|
|
Calculate the power consumption and requirements. |
|
| |
| Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the device. |
|
| |
Plan rack or cabinet location, including required space clearances. | Clearance Requirements for Airflow and Hardware Maintenance for a QFX3500 Device |
|
|
Secure the rack or cabinet to the floor and building structure. |
|
|
|
| Cables | |||
Acquire cables and connectors:
| Interface Specifications for SFP+ Transceivers for QFX3500 Device Access Ports Interface Specifications for SFP+ DAC Cables for QFX3500 Device Access Ports |
|
|
Plan the cable routing and management. |
|
|
|