JCS1200 Chassis Lifting Guidelines
The weight of a fully configured
chassis is about 350 lb (158.8 kg). Observe the following guidelines
for lifting and moving the platform:
- Before moving the platform, read the guidelines in JCS1200 Installation Summary to verify
that the intended site meets the specified power, environmental, and
clearance requirements.
- Do not attempt to lift a fully configured platform by
yourself. Using a mechanical lift to maneuver the platform into
a rack is recommended. If a lift cannot be used, a minimum of four people
must lift the platform, and you must remove components from the
chassis before lifting.
- Before lifting or moving the router, disconnect all external
cables.
To lift routing devices and components,
use the following lifting guidelines:
- Up to 39.7 lbs (18 kg) 1 person lift.
- 39.7 lbs (18 kg) to 70.5 lbs (32 kg) 2 or more person
lift.
- 70.5 lbs (32 kg) to 121.2 lbs (55 kg) 3 or more person
lift.
- Above 121.2 lbs (55 kg) material handling systems (such
as levers, slings, lifts and so on) must be used. When this is not
practical, specially-trained persons or systems must be used (riggers
or movers).
- As when lifting any heavy object, lift most of the weight
with your legs rather than your back. Keep your knees bent and your
back relatively straight and avoid twisting your body as you lift.
Balance the load evenly and be sure that your footing is solid.
Published: 2011-12-15