Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Support
Technical Documentation
Content Explorer New
 
Enterprise MIBs
 
EOL Documentation
 
File Format Help
 
Glossary
 
Portable Libraries
 
 
Home > Support > Technical Documentation > T Series Routers > T640 Router Hardware > T640 Site Preparation Checklist
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...
 

Related Documentation

  • T Series
  • T640 Router Installation Summary
  • T640 Installation Safety Guidelines
 

T640 Site Preparation Checklist

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for router installation.

Table 1: Site Preparation Checklist

Item or Task

For More Information

Performed By

Date

Environment

Verify that environmental factors such as temperature and humidity do not exceed router tolerances.

T640 Environmental Specifications

  
Power

Measure distance between external power sources and router installation site.

T640 DC Power Distribution

T640 DC Power Cable Specifications

  

Locate sites for connection of system grounding.

T640 Chassis Grounding Cable and Lug Specifications

  

Calculate the power consumption and requirements.

T640 DC Power System Requirements

  
Rack

Verify that your rack meets the minimum requirements for the installation of the router.

T640 Rack Requirements

  

Plan rack location, including required space clearances.

T640 Clearance Requirements for Airflow and Hardware Maintenance

  

If a rack is used, secure rack to floor and building structure.

T640 Rack Requirements

  
Cables

Acquire cables and connectors:

  • Determine the number of cables needed based on your planned configuration.
  • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

t640 Calculating Power Budget for Fiber-Optic Cable

T640 Calculating Power Margin for Fiber-Optic Cable

  

Plan the cable routing and management.

Maintaining T640 PICs and PIC Cables

  
 

Related Documentation

  • T Series
  • T640 Router Installation Summary
  • T640 Installation Safety Guidelines
 

Published: 2011-12-19

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out