Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Support
Technical Documentation
Content Explorer New
 
Enterprise MIBs
 
EOL Documentation
 
File Format Help
 
Glossary
 
Portable Libraries
 
 
Home > Support > Technical Documentation > Clearance Requirements for Airflow and Hardware Maintenance of the SRX650 Services Gateway
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...

Documentation Search

Advanced Search |  Search Tips
 

Related Documentation

  • SRX650 Services Gateway Description
  • SRX650 Services Gateway Cabinet Size and Clearance Requirements
  • Site Preparation Checklist for the SRX650 Services Gateway
  • SRX650 Services Gateway Rack Size and Strength Requirements
  • General Site Installation Guidelines for the SRX650 Services Gateway
 

Clearance Requirements for Airflow and Hardware Maintenance of the SRX650 Services Gateway

When planning the installation site for the SRX650 Services Gateway, you need to allow sufficient clearance around the rack.

When planning the installation site for the services gateway, consider the following:

  • For the cooling system to function properly, the airflow around the chassis must be unrestricted.
  • For service personnel to remove and install hardware components, there must be adequate space at the front and back of the services gateway as indicated in Table 1 .
  • If you are mounting the services gateway in a rack with other equipment, ensure that the exhaust from other equipment does not blow into the intake vents of the chassis.

Table 1 provides information about the clearance requirements for maintaining optimum airflow and the distances to facilitate easy maintenance of the services gateway.

Table 1: Clearance Requirements for the SRX650 Services Gateway

Location

Recommended Clearance

Requirement for Clearance

Front of the chassis

8.7 in (22 cm)

Space for service personnel to remove and install hardware components

Rear of the chassis

17.4 in (44.2 cm)

Space for service personnel to remove and install hardware components

Between front-mounting flange and rack or cabinet edge

2.5 in (6.35 cm)

Space for cable management and organization

Between both sides of the chassis and any non-heat-producing surface such as a wall or cabinet side

6.0 in (15.24 cm)

Space for the cooling system to function properly and to maintain unrestricted airflow around the chassis

 

Related Documentation

  • SRX650 Services Gateway Description
  • SRX650 Services Gateway Cabinet Size and Clearance Requirements
  • Site Preparation Checklist for the SRX650 Services Gateway
  • SRX650 Services Gateway Rack Size and Strength Requirements
  • General Site Installation Guidelines for the SRX650 Services Gateway
 

Published: 2010-12-01

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out