The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for installing the SRX220 Services Gateway.
Table 1: Site Preparation Checklist for the SRX220 Services Gateway Installation
Item or Task | Additional Information | Performed By | Date | Notes |
|---|---|---|---|---|
Environment | ||||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | ||||
Power | ||||
| SRX220 Services Gateway Site Electrical Wiring Guidelines SRX220 Services Gateway Power Specifications and Requirements | |||
Rack Installation | ||||
| ||||
Cabinet Installation | ||||
| ||||
Wall Installation | ||||
| Preparing the SRX220 Services Gateway for Wall-Mount Installation | |||
Cables | ||||
| Interface Cable and Wire Specifications for the SRX220 Services Gateway | |||