Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Support
Technical Documentation
Content Explorer New
 
Enterprise MIBs
 
EOL Documentation
 
File Format Help
 
Glossary
 
Portable Libraries
 
 
Home > Support > Technical Documentation > QFX Series > QFX3000 Hardware Documentation > Clearance Requirements for Airflow and Hardware Maintenance for a QFX3100 Director Device
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...
 

Related Documentation

  • QFX Series
  • Cooling System and Airflow in a QFX3100 Director Device
 

Clearance Requirements for Airflow and Hardware Maintenance for a QFX3100 Director Device

When planning the site for installing a QFX3100 Director device, you must allow sufficient clearance around the device.

  • Allow at least 6 in. (15.2 cm) of clearance on the side between devices that have fans or blowers installed. Allow 2.8 in. (7 cm) between the side of the chassis and any non-heat-producing surface such as a wall. For the cooling system to function properly, the airflow around the chassis must be unrestricted. Figure 1 shows the airflow through the QFX3100 Director device.
  • If you are mounting a QFX3100 Director device on a rack or cabinet with other equipment, or if you are placing it on the desktop or floor near other equipment, ensure that the exhaust from other equipment does not blow into the intake vents of the chassis.
  • Leave at least 24 in. (61 cm) both in front of and behind the QFX3100 Director device. For service personnel to remove and install hardware components, you must leave adequate space at the front and back of the QFX3100 Director device. NEBS GR-63 recommends that you allow at least 30 in. (76.2 cm) in front of the rack or cabinet and 24 in. (61 cm) behind the rack or cabinet.

Figure 1: Airflow Through the QFX3100 Director Device

Airflow Through the
QFX3100 Director Device
 

Related Documentation

  • QFX Series
  • Cooling System and Airflow in a QFX3100 Director Device
 

Published: 2012-03-23

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out