Clearance Requirements for Airflow and Hardware Maintenance
for a QFX3008-I Interconnect Device
When planning the site for installing a QFX3008-I Interconnect
device, you must allow sufficient clearance around the device.
Follow these clearance requirements:
- For the cooling system to function properly, the airflow
around the chassis must be unrestricted. Do not block the air intake
or exhaust areas shown in Figure 1 and Figure 2.
The air intake to cool the front card cage and powerhouse is
located below the front fan tray on the chassis. Hot air exhausts
from the powerhouse at the bottom of the chassis, and above the rear
fan tray at the top of the chassis.
Figure 1: Airflow Through
the Front Card Cage and Powerhouse
The air intake to cool the rear card cage is located on the
front sides of the chassis. Cool air is pulled in through the side
fan trays. Hot air exhausts from the Control Boards and rear cards.
Figure 2: Airflow Through
the Rear Card Cage
- If you are mounting the device on a rack or cabinet along
with other equipment, ensure that the exhaust from other equipment
does not blow into the intake vents of the chassis.
- Leave at least 24 in. (61 cm) both in front
of and behind the switch. Allow at least 6 in. (15.2 cm)
of clearance on each side of the chassis. Leave adequate space at
the front of the switch for service personnel to remove and install
hardware components. NEBS GR-63 recommends that you allow at least
30 in. (76.2 cm) in front of the rack or cabinet and 24 in.
(61 cm) behind the rack or cabinet. See Figure 3.
Figure 3: Clearance Requirements for Airflow and Hardware Maintenance for
a QFX3008-I Interconnect Device
Published: 2012-03-23