Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Download Software
Research a Problem Login required
Case Management Login required
Contract & Product Management Login required
Technical Documentation
Documentation Archive
Enterprise MIBs
File Format Help
Glossary
Portable Libraries
End-of-Life Products
Contact Support
Guidelines and Policies
Security Resources
Home > Support > Technical Documentation > M Series Routers > M7i Router Hardware > M7i Router Clearance Requirements for Airflow and Hardware Maintenance
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...

M Series Search

Advanced Search |  Search Tips
 

Supported Platforms

  • M7i Routers
 
 

Related Documentation

  • M Series
  • M7i Router Description
  • M7i Router Physical Specifications
 
Recent Community Posts
Show All Show Fewer 
 
 
Related Links
M Series Product Literature
  • Junos Central
  • Junos Technotes
  • Junos Day One Books
M Series Certification
  • Fast Track Certification Program
  • Certification Study Guides
Junos Technical Education Courses (Free)
  • Networking Fundamentals
  • Junos As A Second Language
  • Junos As A Scripting Language
  • Junos As A Security Language
  • Juniper Networks Books
Support
  • Junos Software (Canada & US)  Login required
  • Junos Software (Worldwide) Login required
  • Knowledge Base - Browse M Series Articles  Login required
  • Technical Bulletins for M Series Login required
  • IOS to Junos Migration Tool Login required
  • ScreenOS to Junos software with enhanced services Migration Tool Login required
Show All Show Fewer 
 
 

M7i Router Clearance Requirements for Airflow and Hardware Maintenance

When planning the installation site, you need to allow sufficient clearance around the rack (see Figure 1):

  • For the cooling system of side-cooled routers to function properly, the airflow around the chassis must be unrestricted. Allow at least 6 in. (15.2  cm) of clearance between side-cooled routers. Allow 2.8 in. (7 cm) between the side of the chassis and any non-heat-producing surface such as a wall.
  • For service personnel to remove and install hardware components, there must be adequate space at the front and back of the router. Allow at least 24 in. (61 cm) both in front of and behind the chassis. NEBS GR-63 recommends at least 30 in. (76.2 cm) clearance in front of the chassis.

    Note: We recommend that you do not install the router in a cabinet. If mounting the router in a cabinet, you must be sure that ventilation is sufficient to prevent overheating.

    Figure 1: Chassis Dimensions and Clearance Requirements

    Image g003202.gif
 

Related Documentation

  • M Series
  • M7i Router Description
  • M7i Router Physical Specifications
 

Published: 2010-10-28

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out