M120 Site Preparation Checklist
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for
router installation.
Table 1: M120 Site Preparation Checklist
Item or Task | Performed By | Date | Notes |
|---|
Verify that environmental factors
such as temperature and humidity do not exceed router tolerances (see M120 Router Environmental Specifications). | | | |
Measure distance between external
power sources and router installation site. | | | |
Select the type of rack or cabinet. | | | |
Plan rack or cabinet location,
including required space clearances. | | | |
If a rack is used, secure rack
to floor and building structure. | | | |
Acquire cables and connectors. | | | |
Locate sites for connection of
system grounding. | | | |
Calculate power budget and power
margin. | | | |
Related Documentation
- JCS 1200
- General Safety Warnings for M Series, MX Series, and T Series Routers
- Installation Safety Warnings for M Series, MX Series, and T Series Routers
- M Series
- M120 Router Chassis Description
- M120 Router Physical Specifications
- General Safety Warnings for M Series, MX Series, and T Series Routers
- Installation Safety Warnings for M Series, MX Series, and T Series Routers
- M120 Chassis Lifting Guidelines
- MX Series
- General Safety Warnings for M Series, MX Series, and T Series Routers
- Installation Safety Warnings for M Series, MX Series, and T Series Routers
- T Series
- General Safety Warnings for M Series, MX Series, and T Series Routers
- Installation Safety Warnings for M Series, MX Series, and T Series Routers
Published: 2011-02-23