Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Download Software
Research a Problem Login required
Case Management Login required
Contract & Product Management Login required
Technical Documentation
Documentation Archive
Enterprise MIBs
File Format Help
Glossary
Portable Libraries
End-of-Life Products
Contact Support
Guidelines and Policies
Security Resources
Home > Support > Technical Documentation > JCS 1200 Platform > JCS 1200 Hardware > Site Preparation Checklist for the JCS1200 Platform
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...
 

Related Documentation

  • JCS 1200
  • JCS1200 Installation Summary
  • JCS1200 Platform Environmental Specifications
 

Site Preparation Checklist for the JCS1200 Platform

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for platform installation.

Table 1: Site Preparation Checklist

Item or Task

For More Information

Performed By

Date

Environment

Verify that environmental factors such as temperature and humidity do not exceed platform tolerances.

JCS1200 Platform Environmental Specifications

  
Power

Locate sites for connection of system grounding.

JCS1200 DC Power Grounding Requirements and Warning

  

Calculate the power consumption and requirements.

  • Power Consumption for an AC-Powered JCS1200 Platform
  • Power Consumption for a DC-Powered JCS1200 Platform
  
Rack

Verify that your rack meets the minimum requirements for the installation of the platform.

  • JCS1200 Cabinet Size and Clearance Requirements
  • JCS1200 Rack Requirements
  

Plan rack location, including required space clearances.

JCS1200 Clearance Requirements for Airflow and Hardware Maintenance

  

If a rack is used, secure rack to floor and building structure.

JCS1200 Connection to Building Structure

  
 

Related Documentation

  • JCS 1200
  • JCS1200 Installation Summary
  • JCS1200 Platform Environmental Specifications
 

Published: 2011-12-15

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out